Reconstruction of MU Historical Buildings
Sub-programme 233 333
Masaryk University is currently implementing an extensive programme focusing on the reconstruction and modernization of existing university buildings in the historical downtown area of Brno. Running parallel to the construction of a new university campus, the entire project – implemented under programme 233 330 “Development of the Material and Technical Base of Masaryk University” – is expected to cost a total of CZK 1.3 billion. The programme includes an extensive reconstruction of the buildings themselves, renovation of technological infrastructure and reconstruction of teaching, laboratory and additional facilities as well as the modernization of laboratory equipment and IT and audiovisual technology.
Implementation of Reconstruction Programmes
Various preliminary projects and international tenders took place prior to construction (fully launched in 2003).
Morphology Centre
The Morphology Centre, i.e. the first completed facility of the new Masaryk University Campus at Bohunice, was handed over to the Faculty of Medicine by the end of 2003 (general contractor: Unistav, a.s.; chief designer: A Plus Brno, a.s.).
Faculty of Social Studies Building on Joštova Street
Following the completion of project documentation (chief designer:
ArchDesign – Ateliér DOS, s.r.o. )
relevant to the reconstruction of the new Faculty of Social Studies
building, previously used by the Faculty of Medicine,
ŽS Brno, a.s. was selected as general
contractor in the third quarter of 2003. Meanwhile, the Faculty of Medicine
moved the departments affected by the reconstruction into temporary spaces
in Tomešova Street. The renovated building in Joštova Street was approved
for occupancy on 14 July 2005 and subsequently handed over to the Faculty of
Social Studies; the grand opening took place on 19 September 2005.
Faculty of Science Complex on Kotlářská Street
The first construction stage, divided into a total of four phases, was
launched in 2003. The public tender for the complete reconstruction of two
facilities housing the geosciences (including the relevant utility systems
and site planning) was awarded to
Komfort, a.s.
All large-scale construction was carried out – according to plan – before
the end of 2003; both facilities were subsequently handed over to their
occupants prior to the opening of the 2004 spring semester. Project
documentation and all preliminary work relevant to the second construction
stage, i.e. reconstruction of the remainder of the complex – including the
completion of the information and study centre construction – was likewise
finalized before the end of 2003. (A public tender was announced and awarded
to Radko Květ and
Kovoprojekta Brno a.s.
for the architectural design of the information centre and the
reconstruction of the existing buildings respectively.) The reconstruction
of the entire Kotlářská Street complex was launched in October 2004 with ŽS
Brno, a.s. as general contractor.
Faculty of Informatics Lecture Halls Construction Finalized
The construction of a large lecture hall (D3), situated above the
existing D1 and D2 lecture rooms (which likewise underwent a partial
reconstruction) in the Botanická Street complex, was carried out in 2003.
The project, developed by architect P. Davídek, was subsequently implemented
by
PSJ Brno, spol. s r.o.
Reconstruction of the Roof of the Faculty of Law Building
The reconstruction of the roof of the Faculty of Law building on Veveří
Street 70, carried out outside the scope of the financing provided within
the framework of Programme 233 330, began in October 2004 and was
successfully finalized in March 2005 (contractor:
KALÁB-stavební firma, spol. s r.o.).
Equipment Purchases
Under the provisions of Sub-Programme 233 333, equipment purchases (including all machinery and other equipment) between 2002 and 2008 amounted to a total of CZK 200.7 million.